Review the whole operation
A depot charging project begins with the fleet schedule. Vehicle types, routes, arrival times and expected dwell time help establish the charging scope. The utility must then review the proposed load.
- Safe heavy-vehicle access
- Trailer and turning clearance
- A utility-reviewed power plan
- A fleet tenant or operating need