Fiber optic infrastructure for Google

Our team built fiber optic infrastructure for Google across Tennessee. That state-wide, large-scale electrical and construction work is the foundation of how we plan and deliver complex utility projects today.

Opry Mills fast-charging station, Nashville

We performed the electrical work for the Electrify America fast-charging station at Opry Mills, 433 Opry Mills Drive, Nashville — a high-power public charging site in one of the busiest retail destinations in Tennessee.

Electrify America fast chargers at Opry Mills in Nashville at night
Opry Mills station · public visitor photo, not GridWise-owned photography · Source: PlugShare

91-stall charging site, Pompano Beach, FL

We built a 91-stall Level 2 charging location at the PepsiCo/Frito-Lay warehouse in Pompano Beach, Florida — large-scale fleet charging designed around the way a working distribution site operates.

Frito-Lay electric delivery trucks connected to Level 2 chargers at a Decatur Georgia depot
Reference photo: Frito-Lay depot in Decatur, GA — not our Pompano Beach project · Photo: Atom Power

650 Murfreesboro Pike, Nashville

Our featured development: Phase 1 brings 8 fast-charging stalls to 650 Murfreesboro Pike in Nashville, developed by GridWise Energy with construction by our own licensed electricians.

HVAC under GridWise Energy

Our HVAC company is part of GridWise Energy, alongside our electrical and infrastructure work. HVAC project details and photos are awaiting confirmation.

More projects, added as verified

Additional projects, references and photos will be published here once verified. We only list work we can stand behind, and we are happy to discuss our experience directly during a site review.